Concrete Contractor for Metal Building Companies and Pole Barn Builders

Slabs poured to your engineer's sealed sheets and bolt plan, anywhere in Polk County.

  • Free on-site estimate
  • Written quote within 48 hours
  • Engineer's plans followed to the letter

Request a Free Estimate

Tell us what you're building. We'll call to set up a site visit.

No obligation. We'll only use your number to talk about this project. By submitting you agree to our Terms and Privacy Policy. Text consent is optional.

Got it. Thank you.

We'll call you shortly to set up a site visit. Need us sooner? Call (863) 269-3083.

The short answer

When your company sells a steel building into Polk County, somebody still has to pour the slab under it, and Concrete Barn Slabs Polk County is the concrete contractor for metal building companies, kit dealers and pole barn builders who want that handed to one sub. We pour to your sealed sheets and anchor-bolt plan, and the quote comes in writing.

Handing the slab to one sub instead of your buyer

Your crew erects steel and sets posts. Concrete is a separate trade with its own permit questions, its own weather and its own ways to stall a building you've already sold. If the buyer has to hunt down a slab crew alone, your delivery date rides on someone you've never met.

We take that piece. You send the engineer's sealed foundation sheets and the anchor-bolt layout from the building package, we walk the pad with you or your buyer at no charge, and the price comes back in writing. We're insured, and we'll name the scope line by line so your quote to the buyer has no gaps.

The work builders hand us covers metal and steel building foundations, pole barn slabs, barndominium foundations, garage and workshop slabs, hangar floors, warehouse slabs, storage building pads and RV and carport pads.

Anchor bolt template set in forms before a metal building slab pour near Lakeland
Anchor bolts in a template ahead of a steel building pour.

From your building package to our forms

The engineer designed the foundation. Our job is to build what's on the sheet, and to flag anything on site that doesn't match it.

  • The sheets set the spec. Thickness, thickened edges, piers, steel and concrete strength come off your drawings. If the pad doesn't match the drawing, we call you and the engineer before anything goes in.
  • Bolts come from your plan. We build the template from the anchor-bolt layout in your package, so bolts land where your columns or posts need them.
  • Revisions come in writing. If the buyer swaps a door or shifts a wall line, we want the revised sheet before we move steel or forms.
  • Strength has a date. Concrete strength is judged at 28 days, so ask your engineer when erection loads can go on the slab instead of guessing from the calendar.
  • Tell us the sequence. On a post-frame barn the pour can come before or after the posts. Our guide to pouring before or after the posts lays out what each order asks of your crew.
Anchor bolt layout and forms staged for a pole barn slab in Winter Haven
Forms and reinforcing staged on a graded pad before concrete arrives.

What It Costs

These are our typical ranges for the slabs building companies hand off to us. Your engineer's sheets and the site set the final number.

JobPer sq ftTypical projectWhat moves the price
Pole barn slab$7 to $12$8,500 to $15,00030x40, 4 to 6 in. reinforced, before or after the frame
Metal and steel building foundation$8 to $14$15,000 to $80,000+Engineered piers or thickened edge, anchor-bolt template
Barndominium foundation$10 to $16$20,000 to $40,000+Monolithic with thickened edges, plumbing and electrical sleeves
Detached garage or workshop slab$7 to $12$4,500 to $15,0002-car garage up to a 30x40 shop
Aircraft hangar slab$10 to $18$36,000 to $120,000+6 to 8 in. reinforced, door-track footing, epoxy-ready finish
Warehouse or commercial slab$7 to $13$40,000 to $250,000+6 in. or more, reinforced, joint layout, flatness spec
Shed or storage building slab$7 to $12$1,800 to $5,000Size and access
RV, boat or carport pad$8 to $14$4,000 to $12,000Length and drainage
These are typical ranges, not a quote. Fill, access, pump needs and the engineer's steel all move the number, and every price comes with a free written estimate after we see the site.

Who does what on a builder job

A slab stalls when a task has no owner. Agree on this table with us before the first truck is booked.

TaskWho handles itWhat we need from you
Foundation design and sealed sheetsYour engineerFinal sheets, stamped
Anchor-bolt template and settingUs, from your planThe bolt layout from the building package
Under-slab plumbingThe plumber on the jobWho it is and when they're on site
Termite soil treatment and certificateA pest control companyIts date, so the sheet goes down right after
Permit and inspection bookingsThe permit holder, named in the contractWhether that's you, your buyer or another contractor
Pour, finish and cureUsThe erection date you're aiming for
Steel or post erectionYour crewWhen the engineer clears the slab for loads
Vapor retarder and wire reinforcement on a sandy pad for a steel building slab in Haines City
Plastic vapor retarder and reinforcing laid before a pour.

How the Job Goes

  1. Send the package

    Upload the sealed sheets, the anchor-bolt plan and the site details from the list above.

  2. Free on-site estimate

    We walk the pad with you or your buyer and note access, fill, drainage and the parcel's jurisdiction.

  3. Written quote in 48 hours

    The price comes in writing, built from the engineer's drawings, with the order of work spelled out.

  4. Roles in writing

    Everyone agrees who holds the permit and who books each inspection.

  5. Pour to the plans

    We pour to the engineer's sheets, then cure the slab so your erection crew gets a sound floor.

Permit counters in the five focus towns, without the phone tree

Inside city limits the city reviews the job; outside them the Polk County Building Division does. The county lists slabs that support a structure as permit work and wants a site plan and foundation plan at minimum. Here's what each focus town's own page or checklist says.

WhereWhat its published page says
City of LakelandAll accessory buildings need a permit; site-built ones need signed and sealed plans, a site plan with setbacks, product approval numbers and a copy of the recorded Notice of Commencement over $5,000
City of Winter HavenBuilding & Permitting Division takes new applications through Accela; ask the division what a slab under an accessory building needs
City of Haines CityBuilding Division handles plan review and inspections, and contractors register with it
City of DavenportSurvey or plot plan with setbacks, a recorded Notice of Commencement at $2,500 or more, and an elevation certificate before slab inspection in a flood hazard area
City of Lake WalesNew buildings, including storage buildings, and parking pads need a permit

The two Notice of Commencement figures come from two different city checklists, so check the one that covers your buyer's parcel.

What to tell a farm buyer who asks about the exemption

A buyer with acreage will ask whether the barn needs a permit at all. Florida's s. 604.50 exempts a nonresidential farm building on land used for bona fide agricultural purposes from the Florida Building Code and local building codes and fees, but dwellings never qualify, floodplain rules still apply, and Polk's Agricultural Exemption Affidavit is valid only with an issued permit. Auburndale still wants a farm building permit for land use and fire code.

Our advice for your quote language: don't promise a permit-free barn. Promise that the owner will confirm the path with the office that covers the parcel, and point them to our farm building exemption guide. A barndominium with a bedroom in it is a house to the code, and the slab gets the house treatment, from termite certificate to vapor sheet.

Building float into the erection date

A pour date you promise a buyer in July is a date the weather can move. The National Weather Service puts the rainy season for this part of Florida at May 25 to October 10, and rain on treated soil before the vapor sheet goes down means the pest control company comes back. So does a crew that drives stakes or parks a trailer on a treated pad, because disturbed soil has to be retreated. Keep your delivery truck and surveyor off the pad between treatment and the pour, or tell us so we can plan the order around them.

After the pour, NRMCA puts curing at typically 3 to 7 days, and concrete left to dry out can lose up to half its potential strength. Don't book the steel crew for the morning after. Ask us for the pour window and the cure plan in the written quote, and pass those dates to your buyer as a range rather than a single day.

The quote package for a steel building slab

Send what you have and tell us what's still pending. A partial package still gets the quote started.

  • Sealed foundation or slab sheets and the anchor-bolt plan.
  • Building size, eave height and use: tractors, vehicles, a lift, aircraft or a shop.
  • A site plan with setbacks, the parcel ID and the jurisdiction.
  • Whether anyone is claiming the farm-building exemption.
  • Slab first or frame first, and who holds the permit.
  • Truck and pump access, and your target erection date.
  • Photos of the pad, and a flood zone note if you have one.

Send it through the contact page or call (863) 269-3083.

Where your buyers' pads are

We pour in Polk County only. Our focus is the Lakeland, Winter Haven, Haines City, Davenport and Lake Wales triangle, with work also taken in Auburndale, Bartow, Lake Alfred, Dundee, Frostproof, Mulberry, Polk City, Fort Meade and Eagle Lake. Each focus town has its own page for steel buildings, such as metal building foundations in Lakeland and steel building slabs in Davenport, with that town's permit desk and ground.

Ground changes the job more than the town line does. A ridge pad near Lake Wales drains fast, while a flatwoods pad a few miles off can hold water near the surface part of the year, so the same kit can need different fill. If a pad needs more than 12 inches of compacted fill under a shallow foundation, the Florida Building Code, Building volume, calls for a geotechnical investigation, and that's worth knowing before you quote the buyer. The full town list is on the service area page.

Questions We Get

Can a metal building company hire you to pour slabs for its Polk County buyers?
Yes. We work as the concrete sub for metal building companies, kit dealers and pole barn builders in Polk County. You give us the sealed foundation sheets and anchor-bolt plan, we walk the pad for free, and the quote comes back in writing. We pour to the engineer's plans, not to a rough guess.
Who pulls the permit for a slab under a steel building we sold?
Whoever your contract names, and it should be in writing before work starts. Polk County lists slabs that support a structure as permit work, and any building regardless of size needs a permit. The permit holder books the inspections. Inside a city, that city's building office runs the review, so start there.
Do you set anchor bolts from our building package?
We build the anchor-bolt template from the layout in your package and the engineer's sealed foundation sheets. If the pad or the bolt plan doesn't match the drawing, we call you and the engineer before the pour. Send the plan with the quote request so the template matches your columns or posts.
What if our engineer revises the foundation sheet after you've quoted?
Send the revised sheet and we re-price the parts that changed. A moved door, a deeper thickened edge or more steel can change the number, and we'd rather adjust the quote on paper than discover the change with forms already set. Until the revision reaches us, we build to the sheet we priced.
Can our delivery truck or surveyor go onto the pad after it's treated?
Keep them off if you can. Florida's termite rule says soil disturbed after treatment must be retreated, and rain on treated soil before the vapor sheet is down means retreatment too. If a delivery or a stake-out has to happen in that window, tell us and we'll sequence the job with you and the pest control company so treatment lands after them.
Does a Davenport flood-zone parcel change the slab schedule?
It adds a survey step. Davenport's permit checklist asks for an elevation certificate before slab inspection on a parcel in a Special Flood Hazard Area, plus a survey or plot plan with setbacks. Book the surveyor early so the certificate is ready when forms are set, and build that day into the erection date you give the buyer.
Should we promise a farm buyer that the barn needs no permit?
No. Florida's 604.50 can exempt a nonresidential farm building on land used for bona fide agricultural purposes, but dwellings never qualify, floodplain rules still apply, and Polk's affidavit requires an issued permit. Auburndale still wants a farm building permit. Tell the buyer to confirm with the office that covers the parcel, and quote the slab either way.

Sources we used

Other Slabs We Pour

Pole Barn Slabs

Floors and footings for post-frame and pole barns, poured before the build or inside the posts after.

Learn more →

Barndominium Foundations

Monolithic foundations for barndominiums: termite-treated, vapor-barriered, and roughed-in to plan.

Learn more →

Shed & Storage Building Slabs

Square, level pads for sheds, prefab storage buildings, and small shops, ready to anchor for Florida wind.

Learn more →

Aircraft Hangar Slabs

Heavy-reinforced hangar floors and door-track footings for private, airpark, and T-hangar builds.

Learn more →

Warehouse & Commercial Slabs

Warehouse, shop, and light-commercial floors with joint plans and finishes built for forklifts and racking.

Learn more →

Metal & Steel Building Foundations

Engineered slabs and pier footings with anchor bolts set to the building manufacturer's drawings.

Learn more →

Detached Garage & Workshop Slabs

Garage and shop slabs with thickened edges, apron, and lift-ready reinforcement where you need it.

Learn more →

RV, Boat & Carport Pads

Long, thick pads for motorhomes, fifth-wheels, boats, and carports, with the approach graded so you can back in clean.

Learn more →

Horse Barn & Equestrian Slabs

Aisles, wash racks, tack and feed rooms finished for traction and drainage. Built for horses and hoses.

Learn more →

Agricultural & Equipment Slabs

Equipment sheds, hay barns, feed and wash pads, and machinery floors for working farms and groves.

Learn more →

Monolithic House Slabs

Monolithic slab-on-grade foundations for new homes, ADUs, and additions, poured to the engineer's plan.

Learn more →

Have a Polk County slab to hand off?

Send the sealed sheets and bolt plan, or call (863) 269-3083. We'll set up a free on-site estimate and put the quote in writing within 48 hours.

Request an Estimate