Waverly at a glance
Waverly is a small unincorporated community in Polk County near Waverly Road and US 27, with grove and farm ground around it. Nearby we pour in Lake Wales, Dundee, Lake Hamilton, Cypress Gardens and Wahneta.
Out here the limits are truck access down a lane, where water sits after rain, the land's agricultural classification and the Central Polk Parkway East study corridor that begins on US 27 north of Waverly Road.
Permit office: Polk County Building Division (Bartow) · official site Waverly is not a city, so the county permits slabs that support a structure. A farm building claiming the s. 604.50 exemption files Polk's affidavit, which is valid only with an issued permit.
Barn, grove and equipment floors out past Waverly Road
Waverly is a small unincorporated community, 661 people at the 2020 Census, with farm and grove ground all around. Polk County as a whole counted 2,197 farms in the 2022 Census of Agriculture, and oranges led its crop acres at 63,900. So the slabs that fit this ground are working floors: an equipment shed or hay barn slab, a storage barn for grove gear, a horse barn aisle, or a steel shop that holds the tractor and the truck.
Waverly isn't a city, so the Polk County Building Division in Bartow is the permit office for a Waverly parcel. The sections below cover what is different out here: getting the truck in, the paperwork that comes before a farm building, the parkway study, and hangars. For the floor itself, our pole barn slab page covers thickness and steel.

Will a loaded mixer make it down your lane?
A barn pad a few hundred feet off the road is a different pour from a backyard job. A full ready-mix truck is heavy. Loose sand that a pickup handles fine can bog it down, worst of all the day after a storm. Walk the route before we do and note four things: the narrowest point, including the gate; any ditch crossing or culvert; low branches and overhead lines; and a spot near the pad where a truck can turn around or back out straight.
If the lane is soft, there are fixes. We can schedule after a dry stretch, put down a firmer path where the truck tracks, or set a pump at the road and run line to the forms. Each one costs money, and we'd rather put it in the written quote than find it on pour day. Pick a washout spot too, away from your well and any low ground that holds water. The National Weather Service puts the rainy season for this part of Florida at May 25 to October 10, so summer pours get an early start and a backup date.

What It Costs
Our typical ranges for Waverly acreage jobs. A 40 by 60 equipment shed floor is 2,400 sq ft, so at $6 to $11 per sq ft it lands around $14,400 to $26,400 before extra fill or a pump at the road.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| Agricultural or equipment slab | $6 to $11 | $6,000 to $40,000+ | Equipment loads, thickness, pad height |
| Pole barn slab | $7 to $12 | $8,500 to $15,000 | 30x40, 4 to 6 in. reinforced, before or after the frame |
| Horse barn or equestrian slab | $7 to $13 | $8,000 to $35,000 | Aisle slope, wash rack, finish |
| Metal or steel building foundation | $8 to $14 | $15,000 to $80,000+ | Engineered piers or thickened edge, anchor-bolt template |
| Aircraft hangar slab | $10 to $18 | $36,000 to $120,000+ | 6 to 8 in. reinforced, door-track footing, epoxy-ready finish |
| Barndominium foundation | $10 to $16 | $20,000 to $40,000+ | Monolithic with thickened edges and rough-in sleeves |
A long or soft lane, a pump at the road and fill to raise a low pad move these numbers most. You get a free written estimate after we see the site.
Ag classification, the March 1 return and Polk's farm barn affidavit
Florida's s. 604.50 lets a nonresidential farm building on land used for bona fide agriculture skip the building code, except floodplain rules. Our farm building exemption guide covers the full test, so here is only the Waverly side of it.
The land part starts at the Property Appraiser. Under s. 193.461, only land used primarily for good-faith commercial agriculture is classified agricultural, and the appraiser weighs how long and how steadily it has been farmed and whether the size fits the use. The classification return is due March 1 each year. If your grove or pasture isn't classified yet, settle that before you count on the exemption.
The building part runs through the county. Polk's Agricultural Exemption Affidavit is notarized and valid only with an issued permit, and the county's plan review guide lists a nonresidential farm building with full-size scaled construction plans, a site plan and the parcel ID. A building anyone will live in never qualifies, so a barndominium on Waverly acreage gets a full house permit.

How the Job Goes
Walk the lane first
We follow the truck route from the road, then check the pad, the grade and where water sits.
Line-item quote
Thickness, steel, anchors, fill and any pump or lane work are priced separately.
Paperwork
You or your builder file with Polk County, with the farm affidavit if the barn qualifies. The permit holder books inspections.
Pour and cure
An early start on a dry day, then the slab stays moist through the cure before the frame or equipment goes on.
The Central Polk Parkway East study near Waverly
Florida's Turnpike Enterprise has a selected corridor for the Central Polk Parkway East that begins on US 27 north of Cypress Gardens Boulevard and Waverly Road. The plan is a new tolled, limited-access road ending on US 17/92 near Ernie Caldwell Boulevard in Davenport, planned as an alternate route to congested US 27. It is a study, not a road under construction, but a corridor line is worth checking before you place a barn you plan to use for decades. The project page has the map.
If your acreage sits near US 27 north of the Waverly Road junction, pull up that map and the parcel lines together before you stake the pad. The study doesn't change how we build the slab. It can change where the slab should go, and how the truck gets to it.
A private hangar on Waverly acreage or a lease at X07
The closest public airport to Waverly is Lake Wales Municipal (X07), owned by the Lake Wales Airport Authority, with a 5,400 by 100 foot runway and tiedowns. A hangar on airport land answers to the authority and its lease terms as well as the permit office, so get their rules in writing before you order steel. A hangar beside a private strip on your own acreage goes through the Polk County Building Division like any other building.
Either way the floor is engineered. Our hangar slabs run 6 to 8 inches reinforced with a footing for the door track and a finish ready for epoxy, and the engineer sets the final numbers from the aircraft and the door. A 60 by 60 hangar floor lands around $36,000 to $65,000 on our ranges. The hangar slab thickness guide walks through what drives that spec.
Pin, photos and plans: what helps us price a Waverly pad
- A map pin on the pad site, plus the parcel ID.
- Photos of the lane from the road to the pad, including the gate and any culvert.
- Building size and use: equipment, hay, horses, a shop or a hangar.
- Kit drawings or the engineer's foundation sheet with the anchor-bolt layout.
- Whether the land is classified agricultural, and the affidavit if you plan to file one.
- Your well location and any spots that hold water after rain.
Call (863) 269-3083 or ask for a free site walk. Nearby we pour in Lake Wales, Dundee, Lake Hamilton, Cypress Gardens and Wahneta.
Questions We Get
Is Waverly its own town with a building department?
My Waverly land is in citrus. Does a storage barn on it still need county paperwork?
When is the agricultural classification deadline for Waverly acreage?
Can a concrete truck reach a barn site down a sand lane off Waverly Road?
Does the Central Polk Parkway East study affect where I build near Waverly Road?
Who do I ask about a hangar at Lake Wales Municipal near Waverly?
Sources we used
- Permit Agencies, Polk County Property Appraiser
- Florida Statutes s. 604.50, Florida Legislature
- Florida Statutes s. 193.461, Florida Legislature
- Agricultural Exemption Affidavit (PD BLD 05), Polk County Building Division
- Permitting and Plans Review Guide, Polk County Building Division
- 2022 Census of Agriculture County Profile: Polk County, USDA NASS
- Central Polk Parkway East, Florida's Turnpike Enterprise
- Lake Wales Municipal Airport (X07), AirNav (FAA data)
- Florida Thunderstorm Season, NWS Tampa Bay Area (NOAA)